29MW GEOTHERMAL POWER STATION
ACTIVITIES OF ZIGO:
- Engineering o Package sizing
- Realization of customer products
- 2D & 3D drawings
- Creation of technical file
- Attended tests
NOTES:
The project will be operational by the end of 2022 and is part of the overall efforts to reduce CO2 emissions from thermoelectric power generation by replacing the electricity grid's dependence on fossil fuels and other energy sources.